Our ambition is for the documents to be a collection of the industry’s experience – increasing safety while reducing cost. We can only achieve that with constructive input from all the industry.
To give input download the input document and send it to info@energycluster.dk. We appreciate your contribution and will get back to you after the next revision at the latest.
To sign up for news, simply email info@energycluster.dk.
VESSEL ACCESS ALIGNED INTERFACES
OE-RP-02. THE WIND PARTNERSHIP
The purpose of this document is to ensure that requirements to vessel access are aligned to enable industry requirements.
Formed by Siemens Gamesa Renewables Energy and MHI Vestas Offshore Wind
RECOMMENDED PRACTICE & GUIDELINE – PLANNING AND EXECUTION OF WTG LIFTING OPERATIONS
OE-GL-01
The purpose of this guideline is to establish minimum requirements for wind turbine lifting operations by collating existing and relevant industry guidance. This document considers various aspects of lifting operations, such as planning, inspection, maintenance, competency, etc. in order to minimize associated risks and to improve health and safety relating to lifting operations.
Verification by DNV-GL
RECOMMENDED PRACTICE – DESIGN OF LIFTING, TRANSPORT, STORAGE AND ACCESSORY EQUIPMENT
OE-RP-01
The purpose of this document is to recommend one practice for the offshore wind industry regarding the design of lifting, transport, storage and handling equipment.
Verification by DNV-GL
ALIGNED SPECIFICATION FOR SURFACE PREPARATION OF CASTED COMPONENTS
EIC-AS-01. The Wind Partnership
The purpose of the aligned specification is to ensure identical requirements and continued alignment for surface preparation of casted components used in offshore wind turbines.
ALIGNED SPECIFICATION FOR INTERNAL ENVIRONMENT
EIC-AS-02. The Wind Partnership
The purpose of the aligned specification is to ensure identical requirements and continued alignment for the internal environment of the turbine, when dehumidification devices are installed.