Tech Talk – Designing the Danish energy islands nr 4 – Offhore Energy Hubs -Grid Code Requirements
OEH’s are currently developed and planned in the North and Baltic Seas, to reach the ambition of achieving an offshore wind power capacity of over 300 GW by 2050. In this 4th Tech Talk, we explore the review of grid code requirements (GCRs) applicable to wind power plants (WPPs) connected to offshore energy hubs (OEHs).